Beijing Zulin Formwork & Scaffolding Co., Ltd.

home products Single-side Bracket Single-side bracket

Single-side bracket

Detailed Product Description


 

 1.Single-side bracket characteristic

On the base of certain operating space, the Single-side Bracket can be used in any single-side wall formwork up to 7.5m, including outside wall of basement, the sewage dealing factory, slopes of the roads and bridges and so on. Usually, an operating space of 4m wide is needed for the highest Single-side Bracket.

2Advantages

2.1Technical advantages:

Simple constructing operation can make the quality control much easier.

There is no necessary to set so many operating platforms.

Wall-through bolt is not used here and the waterproofness is reinforced.

Material save and civilized construction make the Single-side Bracket environmentally protective.

  

2.2Economic advantages

Using the Single-side Wall Formwork can highly reduce the difficulty of the slope-protection.

The constructing site is much smaller.

Much earthwork working is saved.

Inconvenience of construction will never occur, even working space is not enough.

One side of wall formwork and the outside scaffolding are saved.

Waterproof wall-through bolts are saved (while using double formwork in the basement, the waterproof wall-through bolts are one-off and cannot be used repeatedly).

With a fast constructing speed, much time is saved.

2.3Economic compare:

Take one project for example: In this project, four floors underground, 5.2 m per floor, extended outside wall, using stakes to protect slopes, completed in 120 days. Now lets make a cost analysis between using double-side formwork and single-side formwork:

Using double-side formwork:

No.

Items

Unit priceRMB

Quantity

Total price(RMB)

Remarks

1

Earthwork used up and backfilled

10RMB/M3

10000 M3

100000.00

2

Two formworks

380RMB/M2

1040 M2

395200.00

Steel formwork

3

Outside Scaffolding and Pipe support

0.04RMB(M*day)

4500000M

180000.00

4

Inside operation platform and Pipe support

0.04RMB(M*day)

1000000M

40000.00

5

Wall-through bolts

21RMB/ M2

8320 M2

174700.00

6

Manual work

45RMB/(per man*day)

7200(per man*day

324000.00

Total amount:

1213900.00

Using Single-side formwork:

No.

Items

Unit priceRMB

Quantity

Total price(RMB)

Remarks

1

One formwork

380RMB/M2

520M2

197600.00

Steel formwork

2

Bracket H=3600

8RMB(pc*day)

1500(pc*day)

120000.00

Steel formwork

3

Bracket H=1600

8RMB(pc*day)

1500(pc*day)

120000.00

4

Anchor and bolts

3.50RMB/pc

5400pcs

12600.00

5

Manual work

45RMB/(per man*day)

3600(per man*day

162000.00

Total amount:

612200.00

From the above compare we can know that cost saved is about RMB 601700.00, as well as the space for piling up materials is enlarged and the constructing time is shortened.

what can we do  ? product and design

                            product manufacture

                            after-sales support

Single-side bracket Single-side bracket

Send your message to this supplier
« Prev Product 1 2 Next Product »

Other Products from this Supplier

Company Info

Beijing Zulin Formwork & Scaffolding Co., Ltd.
[China (Mainland)]
[Verified Member]

Province/State: Beijing
Country/Region : China (Mainland)

Business Type:Manufacturer

View Contact Details

Email this page Bookmark this page Print this Page